Restricted Area High Voltage Upgrade

Restricted Area High Voltage Upgrade

Location

Anniston Army Depot, Alabama

Project Description

Project consisted of the installation of (6) 400 Amp, 12,470 Volt Hydraulic Re-closers with by-pass and isolation switches. This project also included the change-out of (85) 3-phase distribution poles, which were replaced with concrete poles.